Start with one place. Grow on evidence.
Begin with one site, one faculty or one location. Expand after the measures agreed at the start say so. Three paths, from a single site to a partnership with your network.
One tag, one place.Single site, organisation, or network operator.
Single site
One place- Speed to start
- Scale
- Places
- One ward, faculty, branch or site
- Products
- One or two
- Support
- Tags, setup and a live board
Best for a first deployment, with the measures agreed before the first tag goes up.
You get tags installed, the flows set up, a live board, and a review of the first results.
Organisation
Every site- Speed to start
- Scale
- Places
- Every site you run
- Products
- Built products, plus scoped projects where they fit
- Support
- Roll-out plan and admin training
Best for organisations ready to cover every site, with the products that fit each place.
You get multi-site administration, roles and permissions, live boards, reports and exports.
Network operator
Partnership- Speed to start
- Scale
- Places
- Your customers’ places
- Products
- Agreed per partnership
- Support
- Partnership discussion
Best for network operators who want to bundle engagement services with connectivity.
You get a partnership discussion: which places, which products, and what a first joint pilot would measure. White-label and packaging are agreed per partnership.
What it includes, step by step.
Scope call
The place, the products and the measures, agreed in one conversation. We say what is available and what is scoped.
Tag plan
Which points, which kind of tag, and what each one does. A drawing of the place with every point on it.
Install and set up
Tags encoded and fixed in place. Rules, roles and people set up. Arabic and English checked on site.
Live board
From the first day, the people who run the place see what is happening on a live board.
Review
At the end, the measures agreed at the start are reviewed together. The next step is decided on evidence.
Measures, not promises.
No number is promised before a deployment. Each product page lists what a first deployment measures; these are the kinds of things.
Time
- Time to clear a gate at peak
- Time from alert to response
- Time to answer a service call
Coverage
- Arrivals recorded against the roster
- Patrol checkpoints covered per route
- Alerts where the registered location was enough to find the person
Records
- Overrides per week and their reasons
- Correction requests and how they were settled
- Cases resolved and time to resolve
Start with one place.
Tell us about the place and the problem. We will say what is available today, what is scoped, and what a first deployment would measure.