Module 1 · Spatial control

tap2visit. Visitor passes for gates and entrances.

Pilot ready Tag on the gate

Visitor pre-approval and gate verification. A host creates the visit, the visitor taps the gate tag, and the guard checks the pass. The pass does not open the gate; links to barriers are scoped per project.

A driver reaches from the car window to tap a phone on a tag fixed to a gate post.
Pass valid · Main gate
The chip marks where the tag sits.
The tap

Where it lives, and what one tap does.

Where

Gated communities, corporate campuses and private facilities.

The tap

A resident or approved visitor taps the tag at the gate.

The outcome

Guard-checked visitor passes replace the paper logbook, with a timestamped record of each entry and exit at the gate tag.

How it works

From the tag to the record, in four steps.

The blue step is the tap. The steps before it are set up once; the steps after it show what happens next, and who acts.

  1. Invite

    A resident or host creates a visit: who is coming, when, and through which entrance.

  2. Tap

    The visitor taps the gate tag with the phone they already have. The pass opens in the browser.

  3. Check

    The pass is checked against the visit window and the entrance. The guard sees approved or expired, and decides.

  4. Record

    Entry and exit are logged with their time and place. The paper logbook goes.

Capabilities

What is built and ready to pilot, and what is on the roadmap.

tap2visit is built and offered as a scoped pilot programme: one place, measures agreed before the first tag goes up, and a review at the end.

Built, ready to pilot

  • A host creates a visit with a time window and an entrance
  • The visitor receives a pass that opens in the browser, with nothing to install
  • The guard validates the pass at the gate tag
  • Entry and exit logged with time and place
  • Arabic and English

On the roadmap

  • Links to existing gate barriers and intercoms
  • Configurable visiting rules for wards and restricted floors
  • Contractor and delivery passes
  • Secure tag verification where the deployment requires it
In practice

The tag, the people and the measures.

Hardware

A tag on the gate post, the turnstile or the reception desk.

The QR code is printed on the same tag, so a phone without NFC still works. Designed to support secure (NTAG 424 DNA) tags where a deployment requires them.

People and records

Residents or hosts, visitors, guards and the facility manager.

Languages, records and exports are agreed per project.

What a first deployment measures

  • Time to clear the gate at peak
  • Share of visits approved before arrival
  • Paper logbook entries replaced
Agreed before the first tag goes up
Where it is used

tap2visit in the sectors it serves.

Put tap2visit on the gate.

Start with one place and the measures agreed before the first tag goes up. Time to clear the gate at peak, for a start.